Building ring units or blocks weighing some 1,200-2,000 tonnes, instead of blocks weighing 2-400 tonnes, will significantly reduce the building time in dock. The docklift concept is based on assembling 2-400 tonnes blocks into ring units weighing up to 2,000 tonnes.